Termites are quiet killers that can jeopardize your building’s foundation.
A comprehensive site examination and soil assessment are conducted prior to the start of any construction.
At critical stages of the construction process, a government-approved termiticide is applied directly to the soil.
This includes:
• Flooding footings and foundation trenches with the chemical solution,
• Treating excavated pits and soil around columns for those looking for
Certain areas in a building are more vulnerable to termite entry, such as:
• Plinth levels
• Wall-floor junctions
• Expansion joints
These high-risk points receive extra treatment to ensure there are no gaps in the protective shield. These junctions, often overlooked, are treated with precision to eliminate any weak links in the defense.
Pre-construction termite control is a multi-stage process, applied at various phases such as:
• Before laying the foundation
• During plinth filling
• Prior to flooring
Our termite treatment process strictly follows the Indian Standard Code IS 6313 (Part 2). Once the full treatment is completed, clients receive detailed documentation and certification. This can be highly beneficial for:
• Building approvals
• Construction audits
• Future warranty claims
Pre-construction termite control treatment is not just a precaution—it’s a smart investment in the longevity and durability of your property.